πŸŽ“Complete property planning

School

Safe, connected classrooms and administration areas with controlled operating costs.

Property-specific risks

Design around the building’s real constraints.

01

Wide compounds

Capture this during the preliminary plan and verify it during the engineering survey.

02

Peak simultaneous users

Capture this during the preliminary plan and verify it during the engineering survey.

03

Equipment protection

Capture this during the preliminary plan and verify it during the engineering survey.

Typical spaces

Build the property room by room

πŸŽ“

Classroom / training room

8 suggested light points

Plan space β†’
🏒

Office / workstation area

6 suggested light points

Plan space β†’
πŸ›ŽοΈ

Reception / lobby

6 suggested light points

Plan space β†’
🌿

Compound / garden

6 suggested light points

Plan space β†’